On May 25, 2020, the project contracted by TYMEC was put into operation successfully in Shaanxi Hanzhong Iron and Steel Group, Hanzhong, Shaanxi. It marked the capacity conversion and upgrade of the Shaanxi Hanzhong Iron and Steel Group's steelmaking project (that is, short-term electric arc furnace steelmaking project) was successfully put into production. After the operation of the project, it can fully meet the requirements of regional environmental capacity, and has significant economic and social benefits.
The installation and commissioning of this project coincided with the epidemic situation, and meanwhile, it faced with unfavorable factors such as tight construction period and serious seriousness, TYMEC leaders attached great importance to this project and visited the site many times to guide the work to ensure its efficient implementation. Always adhering to the principle of "quality first, customer first", the efficient work and high-quality equipment from TYMEC have been highly praised by the owners, which is also an important step to achieve brand promotion.