News
Main Products
Company News
Tianjin Taitong 120t LF Put into Operation
Hits:266    Update time:2017/12/14 15:35:26    Collection

We TYMEC contracted 120t LF for Tianjin Taitong Metal Structure Co., Ltd and the equipment got successful commissioning at end of October 2017, each data reaches the target. TYMEC is for basic and detail engineering, manufacture and supply with erection and commissioning. 120t LF performance gets high appraise.

 

Previous:Shaanxi Shenggang 70t EAF Commissioning successfully   Next:New order from GUIXIN Iron and Steel Group
HOME | ABOUT US | QUALIFICATION | PRODUCTS | CASES | CONTACT US Copyright© 2013 Xi’an TAOYUAN Metallurgical Co., Ltd All Rights Reserved